Consist of approximately 41.37 miles of router and crack sealing, 36.87 miles of maintenance chip and seal, 23.25 miles of farm access, 52.5 miles grading/surfacing projects and 52.55 miles of misc. grad. All work shall be conducted with in-house personnel and equipment with approximate cost subject to current Budget limits. 

Please note the City Assistance Projects are not available at this time.

Construction Projects 

15.25 miles of Hot Mix Asphalt (HMA) shall be contracted work. The Hot Mix Asphalt projects shall be managed by the county. County forces shall complete all gravel shoulder reconstruction and crack sealing operations for the HMA projects.

2018 Map of Construction Projects 

 List:

 A1801-C: Emmer Rd – 58 Hwy to 12th Rd

                  1” Milling & 1.5” Hot Mix Asphalt

A1802-C: 19th Rd – Garner Rd to Bridge West of Juneberry Rd          

                 1.5” Hot Mix Asphalt

A1803-C: 16th Rd – Angus Rd to Bridge                               

                 1” Hot Mix Asphalt

A1804-C: Emmer Lane - 58 Hwy to 1000' North of Main St            

                 1” Hot Mix Asphalt

                                                                                              

Structures Replacement 

HDPE Liner pipe of various sizes shall be installed at several locations in the County listed below. The HDPE Liner is a no-dig approach to rehabilitate the existing damaged culverts. The Lining System is the most cost-effective way with an indefinite service life of the culvert. All work shall be conducted with in-house personnel and equipment. Note: Material was purchased in 2016.

2018 Map of Replacement Projects

 List:

 Location:  Description:
11th Rd – Planter Rd .808     for lining   36” dia.    x   81-0”
12th Rd – Underwood Rd .412  for lining   36” x 22”  x   30-0”
12th Rd – Xeric Rd .269   for lining   24” dia.    x   44-0”
Trefoil Rd – 22nd Rd .902  for lining   24” dia.    x   44-0”
Emmer Rd – 4th Rd .533  for lining   34” x 24”  x   44-0”
17th Rd – Oxen Rd .257  for lining   47” x 38”  x   78-0”
Quail Rd – 11th Rd .506  for lining   36” x 24”  x   78-0”
16th Rd – Planter Rd .512   for lining   36” dia.    x   65-6”
Wayside Rd – 3rd Rd .725  for lining   42” x 32”  x   46-0”
Kafir Rd – 16th Rd .289  for lining   30” dia.    x   80-0”
   *Total = approx. 511 Lin ft.

                                               

Road Striping

66 miles of roadway striping shall be contracted work managed by the county.

                                                                                       Total Estimated Cost = $70,000

 

Roadway Shoulder Spraying Program

128.5 shoulder lane miles (various widths) - All work shall be completed with in-house personnel and equipment with approximate cost of material of $60,000.

2018  Map of Roadway Shoulder Spraying Program 

 

Summary

The list of projects is subject to change as weather conditions, time, budget and local conditions demand (i.e. flood damages, failure of structure and repairs to unsafe roadways, etc.).

Support of the 2017 Construction Projects will continue the level of service of the county gravel roads, asphalt roads, Bridges and Culvert type structures county-wide.

* Photo by All Original Photography by Cody George

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer