Construction Projects
Consist of approximately 41.37 miles of router and crack sealing, 36.87 miles of maintenance chip and seal, 23.25 miles of farm access, 52.5 miles grading/surfacing projects and 52.55 miles of misc. grade. All work shall be conducted with in-house personnel and equipment with approximate cost subject to current Budget limits.
Please note the City Assistance Projects are not available at this time.
Construction Projects
15.25 miles of Hot Mix Asphalt (HMA) shall be contracted work. The Hot Mix Asphalt projects shall be managed by the county. County forces shall complete all gravel shoulder reconstruction and crack sealing operations for the HMA projects.
2018 Map of Construction Projects
List:
- A1801-C: Emmer Rd – 58 Hwy to 12th Rd
- A1802-C: 19th Rd – Garner Rd to Bridge West of Juneberry Rd
- A1803-C: 16th Rd – Angus Rd to Bridge
- A1804-C: Emmer Lane - 58 Hwy to 1000' North of Main St
1” Milling & 1.5” Hot Mix Asphalt
1.5” Hot Mix Asphalt
1” Hot Mix Asphalt
1” Hot Mix Asphalt
Structures Replacement
HDPE Liner pipe of various sizes shall be installed at several locations in the County listed below. The HDPE Liner is a no-dig approach to rehabilitate the existing damaged culverts. The Lining System is the most cost-effective way with an indefinite service life of the culvert. All work shall be conducted with in-house personnel and equipment. Note: Material was purchased in 2016.
2018 Map of Replacement Projects
List:
Location: | Description: |
---|---|
11th Rd – Planter Rd .808 | for lining 36” dia. x 81-0” |
12th Rd – Underwood Rd .412 | for lining 36” x 22” x 30-0” |
12th Rd – Xeric Rd .269 | for lining 24” dia. x 44-0” |
Trefoil Rd – 22nd Rd .902 | for lining 24” dia. x 44-0” |
Emmer Rd – 4th Rd .533 | for lining 34” x 24” x 44-0” |
17th Rd – Oxen Rd .257 | for lining 47” x 38” x 78-0” |
Quail Rd – 11th Rd .506 | for lining 36” x 24” x 78-0” |
16th Rd – Planter Rd .512 | for lining 36” dia. x 65-6” |
Wayside Rd – 3rd Rd .725 | for lining 42” x 32” x 46-0” |
Kafir Rd – 16th Rd .289 | for lining 30” dia. x 80-0” |
*Total | approx. 511 Lin ft. |
Road Striping
66 miles of roadway striping shall be contracted work managed by the county.
Total Estimated Cost = $70,000
Roadway Shoulder Spraying Program
128.5 shoulder lane miles (various widths) - All work shall be completed with in-house personnel and equipment with approximate cost of material of $60,000.
2018 Map of Roadway Shoulder Spraying Program
Summary
The list of projects is subject to change as weather conditions, time, budget and local conditions demand (i.e. flood damages, failure of structure and repairs to unsafe roadways, etc.).
Support of the 2017 Construction Projects will continue the level of service of the county gravel roads, asphalt roads, Bridges and Culvert type structures county-wide.